The two plants will be located in Taroudant, in the Souss-Massa region and in El Hajeb, in the Fès-Meknès region, each with a production capacity of 36MW.
( read original story …)
The Dubai News
The two plants will be located in Taroudant, in the Souss-Massa region and in El Hajeb, in the Fès-Meknès region, each with a production capacity of 36MW.
( read original story …)